DATE/
ENROLLMENT
ITEM LINK if any NOTE
1901 Founding.    
1901-1931
Slow growth to under 400 (actual)
  1909 Campus Map No known Maser Plan. ‘Front yard’ plan.
1931-1939
Dips to under 100 (actual)
    Great depression. No known Maser Plan.
1939-1949
2,900 (actual)
  1938 Master Plan War boom. California Public Works Master Plan. Dexter and the ‘Quad’ plan.
1949
4,080 (planning goal)
Allison and Rible Master Plan. 1949 Master Plan ‘Horseshoe’ plan. Allison and Rible was also the architect for the Science Building (52)
1958
12,000 (planning goal)
Department of Education decision to plan all non-metropolitan State Colleges to 12,000.    
1962
12,000
Falk and Booth Master Plan. Adopted 1963. Text (Acrobat)

MAPS:
Property
Property-Zoom
Map
Map-Zoom
Photo 1
Photo 2
Photo 3

This is our 'current' Master Plan.  The entire document is published here.
6/65
12,000
Revision to 1962 Plan.    
6/66
12,000
Revision to 1962 Plan.    
1968
12,000
Corwin Booth Master Plan. Revision to 1962 Plan. Main Map
Planting
Zones
Only the three maps from this document are published here.
11/70
15,000 (planning goal)
Revision to 1962 Plan.    
2/75
15,000
Revision to 1962 Plan. Map From this time on, the "Master Plan" consisted of only a map.
9/81
15,000
Revision to 1962 Plan. Map  
3/83
15,000
Revision to 1962 Plan. Map
Map-Zoom
 
7/84
15,000
Revision to 1962 Plan.    
9/84
15,000
Revision to 1962 Plan. Map  
7/85
15,000
Revision to 1962 Plan. Map  
11/86
15,000
Revision to 1962 Plan. Map  
11/89
15,000
Revision to 1962 Plan. Map  
1996
15,000
Digitized version of the 11/89 plan. Requires Acrobat
Core
Farm
Although not a listed revision, this plan shows the final location of the parking structure and shows some outlying areas for the first time.
1996 Campus Planning Committee Working Draft of the Master Plan Map Requires Acrobat
Core
Farm
This map shows many of the Campus Planning issues and ideas explored by the Campus Planning Committee in the early 90's.  Not approved by the Board of Trustees.
3/97
15,000
Revision to 1962 Plan. Requires Acrobat
Core
Farm
Sports complex and electrical substation addition.
2/98
15,000
Revision to 1962 Plan. Requires Acrobat
Core
Farm
Advanced Technology Laboratories site, the new engineering building site, the Thermal Energy Storage Tank site, and other minor revisions.
1/2000
15,000
Revision to 1962 Plan. Requires Acrobat
Core
Farm
This is the current Board of Trustees approved Master Plan showing the new Housing Complex site and other minor revisions.