Facilities Notifications
Partial Road Closure - Truckee Road | |
---|---|
Schedule | Sep 16, 2025, 08:00 pm — Sep 25, 2025, 05:00 pm |
Affected Services: |
A section of Truckee Road between Village Drive and East Safety Way will be temporarily closed to vehicular and foot traffic. The east entrance to parking lot H-4d will be inaccessible for the duration of the closure. Campus occupants and visitors may observe construction-related activity and noise. Please observe all traffic control measures, and exercise caution when traveling near active work sites. |
Affected Location: |
|
Why: | Truckee Road To perform utility make-ready work for the Student Success Center project. |
Alternate Routes: |
|
Permanent Parking Lot Closure and Construction Activity - Parking Lot H-4f | |
---|---|
Schedule | Sep 18, 2025, 06:00 am — Sep 01, 2027, 10:00 am |
Affected Services: |
Parking lot H-4f will be permanently closed. Campus occupants and visitors may observe construction-related activity and noise. Please observe all work site signage and exercise caution when traveling near active work sites. |
Affected Location: |
|
Why: | Parking Lot H-4f For construction of the new Student Success Center building. |
Alternate Routes: |
|
Construction Noise and Activity - North Perimeter Road at Village Drive | |
---|---|
Schedule | Sep 11, 2025, 08:00 pm — Sep 19, 2025, 06:00 am |
Affected Services: |
Vehicular traffic on North Perimeter Road, between Village Drive and East Safety Way, will be down to one lane. Work will be done at night to reduce the impact to traffic. Campus occupants and visitors may observe construction-related activity and noise. Please observe all traffic control measures, and exercise caution when traveling near active work sites. |
Affected Location: |
|
Why: | North Perimeter Road at Village Drive For sewer upgrades related to the Student Success Center and the new Housing development |
Alternate Routes: | N/A |
Fire and Life Safety Systems Testing - Multiple Buildings | |
---|---|
Schedule | Sep 06, 2025, 06:00 am — Sep 30, 2025, 03:00 pm |
Affected Services: |
Occupants may observe the presence of personnel in the building conducting fire and life safety systems testing, including fire alarms and fire door systems. Occupants may observe audible alarms, strobe lights, fire door testing, and audio instructions in select buildings. Occupants may notice reduced water pressure from fixtures in kitchens and restrooms due to fire suppression testing. Evacuation is not necessary. |
Affected Location: |
|
Why: | Multiple Buildings Fire life and safety systems testing. |
Alternate Routes: | N/A |
Partial Parking Lot Closure - Parking Lot H-4f | |
---|---|
Schedule | Aug 04, 2025, 07:00 am — Sep 17, 2025, 05:00 pm |
Affected Services: |
The west end of parking lot H-4f and parking on Truckee Road in front of the Facilities Building 70 will be temporarily unavailable. Campus occupants and visitors may observe construction-related activity and noise. Please observe all work site signage and exercise caution when traveling near active work sites. |
Affected Location: |
|
Why: | Parking Lot H-4f To perform utility make-ready work for the Student Success Center project. |
Alternate Routes: |
|