Facilities Notifications

Construction Noise and Activity - North Perimeter Road
ScheduleSep 23, 2025, 09:00 pm — Dec 12, 2025, 06:00 am
Affected Services:

Vehicular traffic on North Perimeter Road, between Village Drive and University Drive, will be down to one lane. Work will be done at night to reduce the impact to traffic. Campus occupants and visitors may observe construction-related activity and noise. Please observe all traffic control measures, and exercise caution when traveling near active work sites.

Affected Location:
  • North Perimeter Road
  • Village Drive
  • University Drive
  • East Safety Way
  • West Safety Way
  • Truckee Road
  • Via Carta
  • Cal Poly Corporation Administration Building 15
  • Building 74 Modular Offices
  • Parking Lot H-4a
Why:Construction Noise and Activity - North Perimeter Road

To upgrade, repair and replace the existing sewer lines.

Alternate Routes: N/A
Partial Road Closure – Grand Avenue
ScheduleNov 24, 2025, 08:30 am — Dec 31, 2025, 02:00 pm
Affected Services:

Vehiclular traffic on Grand Avenue will be down to one lane while utility work is performed. Flaggers and traffic control will be present. Please observe all traffic control measures, including detour signage, and exercise caution when traveling near active work sites.

Affected Location:
  • Grand Avenue
  • Christopher Cohan Performing Arts Center Building 6
  • Vista Grande Building 112
  • Sierra Madre Housing Complex 113
  • Yosemite Housing Complex 114
  • Grand Avenue Parking Structure 131
  • yak?it?ut?u Housing Complex 172
Why:Partial Road Closure – Grand Avenue

To upgrade underground utilities to support the new housing program.

Alternate Routes: N/A
Construction Activity and Sidewalk Closure - Avila Residence Building 129
ScheduleNov 17, 2025, 08:00 am — Dec 05, 2025, 05:00 pm
Affected Services:

The driveway to the Avila Residence will be closed for repairs, and the sidewalk at the Grand Avenue entrance of the driveway will also be closed. All pedestrian traffic will be directed to go around the construction zone.

Campus occupants and visitors may observe construction-related activity and noise. Please observe all traffic control measures, and exercise caution when traveling near active work sites.
Affected Location:
  • Avila Residence Building 129
Why:Avila Residence Building 129

For underground utility repair and maintenance.

Alternate Routes:

Use Deer Road behind Yosemite Hall Complex 114.