| Construction Activity and Road Closure - Truckee Road | |
|---|---|
| Schedule | Jun 18, 2026, 06:00 am — Jun 19, 2026, 05:00 pm |
| Affected Services: |
Campus occupants will experience construction activity, equipment, and concrete work on Truckee Road at the new Student Success Center project. A portion of Truckee Road will be fully closed. Parking Lots H-4E and H-4D will remain open and will be accessible via East Safety Way and Truckee Road. The road will re-open at 5:00 p.m. Thursday night and close again Friday morning at 5:00 a.m. |
| Affected Location: |
|
| Why: | Construction Activity and Road Closure - Truckee Road For placement of concrete on the roof level of the Student Success Center. |
| Alternate Routes: |
|
| Christopher Cohan Performing Arts Center Building 6 - Construction Noise and Activity | |
|---|---|
| Schedule | Jun 15, 2026, 07:00 am — Jun 26, 2026, 04:00 pm |
| Affected Services: |
Building occupants and visitors may observe the presence of personnel, construction activity and related noise while performing roofing repairs. Please observe all work site signage and exercise caution when near active work sites. |
| Affected Location: | Christopher Cohan Performing Arts Center Building 6 |
| Why: | Christopher Cohan Performing Arts Center Building 6 - Construction Noise and Activity For roofing repairs to stop water intrusion into the PAC Pavillion. |
| Alternate Routes: | N/A |
| Reduced Waste Service - Campus-Wide | |
|---|---|
| Schedule | Jun 17, 2026, 12:00 am — Aug 16, 2026, 12:00 am |
| Affected Services: |
There will be a reduction in trash, recycling, and organic waste services throughout campus over the summer. As you prepare for summer, please do not overload trash/recycling bins in classrooms, offices, or other spaces, as custodial staff must manage this waste and heavy/overfilled bins can lead to injuries. For disposal of confidential papers including exams, please contact Facilities Customer Business Services at facilities-cbs@calpoly.edu. |
| Affected Location: | Campus-Wide |
| Why: | Reduced Waste Service - Campus-Wide To implement a waste-efficiency strategy during periods of reduced waste generation over the summer months. |
| Alternate Routes: | N/A |
| Intermittent Electrical Service Outage - Campus-wide | |
|---|---|
| Schedule | Jun 17, 2026, 05:00 am — 09:30 pm |
| Affected Services: |
Electrical service will be temporarily unavailable for two thirty-minute intervals. First 30 minute power outage will occur between 5:00 a.m. and 6:30 a.m. Second 30 minute power outage will occur between 7:00 p.m. and 9:30 p.m. Please consider department-owned equipment that may be impacted by an electrical outage and prepare accordingly. This maintenance/work may temporarily disrupt IT services, including access to Wi-Fi, the campus network, computer labs, and other online tools. If your equipment powers down during this work, please restart it once service is restored. After the restart, if you continue to experience issues, please contact the IT Service Desk or open a support ticket. For real-time updates on IT systems, visit the Cal Poly ITS Systems Status page. Link for the ITS System Updates page: https://calpolysystemsstatus.statuspage.io/ |
| Affected Location: | Campus-wide |
| Why: | Intermittent Electrical Service Outage - Campus-wide For PG&E to perform critical safety maintenance to their distribution lines. |
| Alternate Routes: | N/A |
| Vehicular Traffic Impairment - Grand Avenue at Slack Street | |
|---|---|
| Schedule | May 26, 2026, 07:00 am — Jun 12, 2026, 12:00 pm |
| Affected Services: |
Vehicle traffic at the intersection of Grand Avenue and Slack Street may be temporarily slowed or controlled to accommodate construction and landscaping vehicles. Please observe all traffic control measures, including detour signage, and exercise caution when near active construction zones. |
| Affected Location: |
|
| Why: | Vehicular Traffic Impairment - Grand Avenue at Slack Street For landscaping improvements along Grand Avenue entrance. |
| Alternate Routes: |
|
| Construction Noise and Activity - Multiple Locations | |
|---|---|
| Schedule | May 04, 2026, 06:00 am — Jul 31, 2026, 05:00 pm |
| Affected Services: |
Campus occupants and visitors may observe construction-related activity and noise as furniture will be moved throughout buildings at various times. Please respect all work areas and posted signage and exercise caution when traveling by these active work sites. |
| Affected Location: |
|
| Why: | Construction Noise and Activity - Multiple Locations To update building spaces and furniture in various locations around campus. |
| Alternate Routes: | N/A |
| Construction Activity and Sidewalk Closure - North Perimeter Road and Village Drive | |
|---|---|
| Schedule | Mar 21, 2026, 06:00 am — Sep 27, 2027, 03:00 pm |
| Affected Services: |
Pedestrian traffic will be diverted from the north side sidewalk of North Perimeter Road and the west side sidewalk of Village Drive, due to construction activity. Please observe all traffic control measures, including detour signage, and exercise caution when near active construction zones. |
| Affected Location: |
|
| Why: | Construction Activity and Sidewalk Closure - North Perimeter Road and Village Drive For the construction of the Student Success Center. |
| Alternate Routes: |
Pedestrian traffic to be diverted to the east sidewalk of Village Drive. Pedestrian traffic to be diverted to the south sidewalk of North Perimeter Road. |
| Construction Noise and Activity - EHS Residence Building 48A | |
|---|---|
| Schedule | Mar 02, 2026, 07:00 am — Jun 12, 2026, 05:00 pm |
| Affected Services: |
Building occupants will observe construction activity and related noise. Construction vehicles will also be present. Re-routing will not be necessary, but please observe work site signage and exercise caution when near active work sites. |
| Affected Location: |
|
| Why: | Construction Noise and Activity - EHS Residence Building 48A To refresh the existing residence. |