| Construction Activity and Stairway Closure - Administration Building 1 | |
|---|---|
| Schedule | Jul 24, 2026, 08:00 am — Aug 14, 2026, 04:00 pm |
| Affected Services: |
Campus occupants will experience construction activity, equipment, and concrete work at Administration Building 1. A portion of the main entrance patio, as well as the entire stairway adjacent to Building 1 and parallel to South Perimeter Road, will be closed for the duration of the project. All (other) walkways, ramps, stairs, and entrances are unaffected. Please respect all work areas and posted signage and exercise caution when traveling by these active work sites. |
| Affected Location: | Administration Building 1 |
| Why: | Construction Activity and Stairway Closure - Administration Building 1 For the removal and placement of concrete. |
| Alternate Routes: | Access ramp near affected stairway. |
| Construction Noise and Activity - Christopher Cohan Performing Arts Center Building 6 | |
|---|---|
| Schedule | Aug 03, 2026, 07:00 am — Aug 14, 2026, 04:00 pm |
| Affected Services: |
Building occupants may experience construction activity and related noise in the Performing Arts Center gallery level corridor. Please observe work site signage and exercise caution when near active work sites. |
| Affected Location: | Christopher Cohan Performing Arts Center Building 6 |
| Why: | Construction Noise & Activity - Christopher Cohan Performing Arts Center Building 6 To repair drywall damaged prior to the South Gutter Roof Repairs project. |
| Alternate Routes: | N/A |
| Fume Hood Systems Outage - Warren J. Baker Center for Science and Mathematics Building 180 | |
|---|---|
| Schedule | Aug 03, 2026, 08:00 am — Aug 21, 2026, 04:00 pm |
| Affected Services: |
Fume hoods and ventilation systems will be temporarily unavailable to safely perform work in the Warren J. Baker Center for Science and Mathematics Building 180. |
| Affected Location: | Warren J. Baker Center for Science and Mathematics Building 180 |
| Why: | Fume Hood Systems Outage - Warren J. Baker Center for Science and Mathematics Building 180 To replace parts in lab exhaust fan equipment. |
| Alternate Routes: | N/A |
| Construction Noise and Activity - Student Services Building 124 | |
|---|---|
| Schedule | Jul 27, 2026, 08:00 am — Jul 31, 2026, 04:00 pm |
| Affected Services: |
Campus and building occupants will observe contractors working in the buildings hallways to install new security cabling. Construction-related activity and noise may also be present. Please observe work site signage and exercise caution when near active work sites. |
| Affected Location: | Student Services Building 124 |
| Why: | Construction Noise and Activity - Student Services Building 124 For cable installation and upgrades for the Access Control and Security System upgrade. |
| Alternate Routes: | N/A |
| Fire and Life Safety Systems Testing - Multiple Buildings | |
|---|---|
| Schedule | Jul 20, 2026, 06:00 am — Jul 31, 2026, 03:00 pm |
| Affected Services: |
Occupants may observe the presence of personnel in the building conducting fire and life safety systems testing, including fire alarms and fire door systems. Occupants may observe audible alarms, strobe lights, fire door testing, and audio instructions in select buildings. Occupants may notice reduced water pressure from fixtures in kitchens and restrooms due to fire suppression testing. Evacuation is not necessary. |
| Affected Location: |
Testing Performed from 6:00 a.m. - 3:00 p.m. Daily Monday, July 20, 2026 through Friday, July 24, 2026
Saturday, July 25, 2026
Monday, July 27, 2026
Tuesday, July 28 through Friday, July 31, 2026
|
| Why: | Fire life and safety systems testing and inspections. |
| Alternate Routes: | N/A |
| Construction Noise and Activity - Faculty Offices East Building 25 | |
|---|---|
| Schedule | Jul 20, 2026, 07:00 am — Aug 21, 2026, 05:00 pm |
| Affected Services: |
Carpenters and contractors will be seen on the roof and inside the building, performing leak assessments and necessary corrective work. Please respect all work areas and posted signage and exercise caution when traveling by these active work sites. |
| Affected Location: | Faculty Offices East Building 25 |
| Why: | Construction Noise and Activity - Faculty Offices East Building 25 For leak assessments and roofing maintenance and repairs. |
| Alternate Routes: | N/A |
| Construction Activity and Intermittent Parking Lot Closure - Grand Avenue Parking Structure 130 | |
|---|---|
| Schedule | Jul 20, 2026, 06:00 am — Aug 14, 2026, 04:00 pm |
| Affected Services: |
Campus occupants and visitors may observe the presence of personnel, construction activity, and related noise while the parking structure lighting is being retrofit. Parking availability will vary, depending on the location of construction activities within the parking garage. Please observe all work site signage and exercise caution when near active work sites. |
| Affected Location: | Grand Avenue Parking Structure 130 |
| Why: | Construction Activity and Intermittent Parking Lot Closure - Grand Avenue Parking Structure 130 To retrofit LED lighting in the parking structure. |
| Alternate Routes: | N/A |
| Roadway Painting - Grand Avenue & North Perimeter Road | |
|---|---|
| Schedule | Jul 20, 2026, 09:00 am — Aug 14, 2026, 06:00 pm |
| Affected Services: |
Roadway painting will occur on Grand Avenue and North Perimeter Road, from the intersections of Grand Avenue and Slack Street to North Perimeter Road and University Drive. No utility service interruptions or roadway closures are expected. Campus occupants and visitors may observe construction related activity and noise. Flaggers will be present. Please observe all traffic control measures, including detour signage, and exercise caution when traveling near active work sites. |
| Affected Location: |
|
| Why: | Roadway Painting - Grand Avenue & North Perimeter Road For roadway painting. |
| Alternate Routes: | N/A |
| Partial HVAC Outage - Science Building 52 | |
|---|---|
| Schedule | Jun 30, 2026, 10:00 am — TBD |
| Affected Services: |
Heating and ventilation will experience a service interruption for the duration of the repairs. The work being performed will affect rooms E-8 through E-19. Occupants may notice the presence of facilities personnel in the building along with possible temperature fluctuations. |
| Affected Location: | Science Building 52 |
| Why: | Partial HVAC Outage - Science Building 52 To replace failed parts of HVAC equipment. |
| Alternate Routes: | N/A |
| Domestic Water Outage - Faculty Offices North Building 47 | |
|---|---|
| Schedule | Jun 23, 2026, 08:00 am — TBD |
| Affected Services: |
Domestic water service will be temporarily unavailable to areas for the second and third floors. Areas including drinking fountains, water stations, and restrooms, and custodial closets will be impacted. Please observe work area signage and exercise caution when near active work sites. |
| Affected Location: |
Faculty Offices North Building 47: Second Floor Spaces 21, 22, 23 Third Floor Spaces 34J, 35J, 36J |
| Why: | Domestic Water Outage - Faculty Offices North Building 47 To address a leak and make necessary repairs. |
| Alternate Routes: | Alternate restrooms located at 25J and 26L |
| Landscape Improvements - Multiple Locations | |
|---|---|
| Schedule | Jun 16, 2026, 07:00 am — Aug 14, 2026, 04:00 pm |
| Affected Services: |
Temporary construction fencing will be installed at each location for Summer 2026 Landscape Improvements. No utility service interruptions expected. Please exercise caution for landscapers, landscaping equipment and respect any safety signage. |
| Affected Location: |
|
| Why: | Landscape Improvements - Multiple Locations For landscape improvements. |
| Alternate Routes: | N/A |
| Reduced Waste Service - Campus-Wide | |
|---|---|
| Schedule | Jun 17, 2026, 12:00 am — Aug 16, 2026, 12:00 am |
| Affected Services: |
There will be a reduction in trash, recycling, and organic waste services throughout campus over the summer. As you prepare for summer, please do not overload trash/recycling bins in classrooms, offices, or other spaces, as custodial staff must manage this waste and heavy/overfilled bins can lead to injuries. For disposal of confidential papers including exams, or if a trash receptacle needs attention, please contact Facilities Customer Business Services at facilities-cbs@calpoly.edu or (805) 756-5555. |
| Affected Location: | Campus-Wide |
| Why: | Reduced Waste Service - Campus-Wide To implement a waste-efficiency strategy during periods of reduced waste generation over the summer months. |
| Alternate Routes: | N/A |
| Construction Noise and Activity - Multiple Locations | |
|---|---|
| Schedule | May 04, 2026, 06:00 am — Jul 31, 2026, 05:00 pm |
| Affected Services: |
Campus occupants and visitors may observe construction-related activity and noise as furniture will be moved throughout buildings at various times. Please respect all work areas and posted signage and exercise caution when traveling by these active work sites. |
| Affected Location: |
|
| Why: | Construction Noise and Activity - Multiple Locations To update building spaces and furniture in various locations around campus. |
| Alternate Routes: | N/A |
| Construction Activity and Sidewalk Closure - North Perimeter Road and Village Drive | |
|---|---|
| Schedule | Mar 21, 2026, 06:00 am — Sep 27, 2027, 03:00 pm |
| Affected Services: |
Pedestrian traffic will be diverted from the north side sidewalk of North Perimeter Road and the west side sidewalk of Village Drive, due to construction activity. Please observe all traffic control measures, including detour signage, and exercise caution when near active construction zones. |
| Affected Location: |
|
| Why: | Construction Activity and Sidewalk Closure - North Perimeter Road and Village Drive For the construction of the Student Success Center. |
| Alternate Routes: |
Pedestrian traffic to be diverted to the east sidewalk of Village Drive. Pedestrian traffic to be diverted to the south sidewalk of North Perimeter Road. |